Customised solution Mooring facilities equipped with power column

Jun 28, 2022

ES 230 power column at «Camping les 3 lacs SA»

Power and water connections combined

Initial situation

The power supply at the mooring facilities had to be guaranteed, in order to comply with the current standards. Two berths are now optimally supplied with electricity and water from only one ES 230 power column made of aluminium. In this respect, the power consumption can be charged per user by means of the two integrated meters.

General information

  • Customer / installation engineer: Camping les 3 lacs SA, Sugiez / Noyer Electricité Sàrl, Sugiez
  • Requirement: Individual measuring of the socket outlets
  • Solution: Safe power guaranteed at the mooring facilities
  • Article: 220907 / Power column type ES 230
  • Quantity: 1

Customer benefits

  • weather-resistant
  • equipped according to customer requirements / specifications
  • new installation in accordance with the current regulations
  • safe energy available at all times

Areas of application

  • marina
  • camp sites

Products

show all (3)

Your order is being processed